Discipline Production Engineering
LevelFoundation
Duration12 Days
Delivery Mechanism Classroom
Interested in attending this course? Click below to be alerted when scheduled


Print Email

Introduction to Completions and Well Interventions

This extended course (12days) is intended to provide new completions and well intervention engineers and supervisors with a broad overview of all aspects of completions and well interventions operations planning and monitoring. 

 

 

 

  • Agenda
  • Topics
  • Audience
  • Prerequisites
  • Agenda

    Day 1

    Introduction to Well Completions

    • Types of Well Completions
    • Tubing & Tubing Connections
    • Packers
    • Completions Accessories

    Day 2

    Well Cementing

    • Primary Cementing
    • Remedial Cementing
    • Cement bond logs

    Day 3

    Perforating & Well Control

    • Perforating
    • Well Control

    Day 4

    Sand Control & Sand Management

    • Sand Control Completions
    • Sand Management

    Day 5

    Modern Intelligent Completions

    • Multilateral Completions
    • Smart Completions
    • Comparison between active and passive control

    Day 6

    Slim Wells and Slickline Interventions

    • Slim Wells
    • Slim Well Repairs
    • CT Completions
    • Slickline Well Interventions 

    Day 7

    Well Integrity

    • Introduction to Well Integrity
    • Production Logging
    • Corrosion 

    Day 8

    Horizontal Wells

    • Horizontal Well Completions
    • Horizontal Well Performance
    • Horizontal Well Logging

    Day 9

    Productivity enhancement through Matrix Stimulation

    • Formation Damage Mechanisms
    • Candidate Selection for Acidizing
    • Acidizing in Sandstones and Carbonates

    Day 10

    Productivity enhancement through Hydraulic Fracturing

    • Fracturing Treatment Objectives
    • Hydraulic Fracturing Models
    • Minifrac
    • Fracturing Design

    Day 11

    Well Intervention with Through-Tubing techniques

    • Matrix Stimulation with CT
    • High Pressure Jetting
    • Fill Clean-Outs
    • CT Logging
    • Use of Nitrogen

    Day 12

    Electrical Submersible Pumps (ESP) and Other Systems

    • Overview of Artificial Lift Systems
    • Electric Submersible Pumps
    • Rod Pumps
    • Progressive Cavity Pumps
    • Gas Lift

     

     

  • Topics

    Well Completions

    Well Cementing

    Perforating and & Well Control

    Sand Control and Sand Management

    Modern Intelligent Completions

    Slim Wells

    Slickline Interventions

    Well Integrity

    Horizontal Wells

    Productivity enhancement through Matrix Stimulation

    Productivity enhancement through Hydraulic Fracturing

    Well Intervention with Through-Tubing techniques

    Electrical Submersible Pumps (ESP) and Other Systems

  • Audience

    Fresh-out Production, Drilling, Completion Engineers and other professionals involved in Well Intervention projects.

  • Prerequisites

    Basic knowledge and field exposure to well operations.

  • Prerequisites

©2000-2016 NExT. All Rights Reserved.